50 Projects, Let's Do This! 2022

January (finished projects: 11) all from stash
2 grocery totes
2 cloth gift bags,
casserole carrier;
2 pillowcases;
cloth catch bin for table.
Pink ruffly blouse (semi-drafted, no shawl collar). It might as well be spring
Stitchalong hoop

February (finished projects: 8)

  1. blue ruffly blouse It might as well be spring .
  2. Drafted shawl collar pattern following How To Draft A Classic Shawl Collar | 2020 Updated Version - YouTube
  3. Made a CYA from an old shirt. CYA blouse extension
  4. Made a blouse from a skirt. Boho tunic
  5. Embellished a blouse I made last year. Embellished tunic
  6. Designed and 3D printed a hub for dominos that includes storage for trains. Shared it on Thingiverse Mexican train hub with storage by steiconi - Thingiverse
  7. Emptied my fabric cabinet, wrestled it from the studio to dining room, and filled it with games.
  8. Assembled and filled new 20-cubby storage unit. It does so count, though the new unit isn’t from scratch.

March (finished projects: 16)

  1. bed pad carrier for sweet sleep on our travels.
  2. went through (almost) ALL of my craft supplies, made some hard decisions.
  3. Pillow carrier
  4. Pregnant curtains
  5. Strung up a whole lotta beads. Bead window hanging
  6. undies
  7. Made earrings from some Peachbloom glass.
  8. pads
  9. Olive green tunic https://forum.lettucecraft.com/t/refashioned-top-top-dress-top-top-top-top
    which includes all the other tops and dresses made this month.
  10. Beige and blue dress
  11. Another green tunic
  12. Hide-a box for passports and such
  13. Beige tunic
  14. Sewing weights filled with high-carb white rice
  15. Table organizer
  16. March stitchalong

YTD 35
April New goal: 30 projects in 30 days. Did it!

  1. prepped supplies for class I’m teaching tomorrow
  2. Designed and 3D printed a base for my new salt and pepper grinders
  3. Paint dyed black and white skirt to black and shades of blue
  4. Taught class
  5. Finished yet another tunic
  6. Dyed a few other black and white fabrics to coordinate with skirt, to use for bodice.
  7. Made a summer nightshirt from stash gauze
  8. Made another one :slight_smile:
  9. And another!
  10. Small crossbody purse for travel. Too small, doubled it. Still too small. Sigh.
  11. Stealth purse to wear under my blouse to hold passport.
  12. Two more stealth purses; #11 was too small, and hubby wanted one.
  13. Simple billfold
  14. Sorted huge gift of beads and findings into my stash.
  15. Crafted a 4-piece thank you gift. https://forum.lettucecraft.com/t/bead-thingies
    50 projects in 100 days!
  16. Visor, drafted pattern and made beige version. Pix of all the visors at Visors 2022
  17. Hawaiian fabric visor
  18. blue and white visor, narrow band
  19. hubby’s visor, narrow band
  20. Mending and alterations
  21. April Stitch Along Let’s Stitch Along to the End of Time! - #1414 by steiconi
  22. Took apart April #10 and turned it into a travelling jewelry keeper.
  23. camera case with cable pocket
  24. Repadded dressform
  25. Draped shoulder princess bodice
  26. Tea dyed fabric for piping
  27. Paint dyed more fabric for piping on another project. Made piping!
  28. Tested and adjusted bodice.
  29. Redyed piping fabric. Made 6+ yards of piping.
  30. Drafted petal sleeve pattern.
    YTD 65

May

  1. Made a dress using draped pattern, piping, and petal sleeve New techniques! New dress!
  2. Made a new ditty bag Ditty bag using the good stuff
  3. enlarged camera case.
  4. made another nightshirt
  5. designed and 3D printed bramble frame for Sleeping Beauty booknook.
  6. Two more nightshirts
  7. May stitch along On the Road Again
  8. Bead thingies. Bead thingies
  9. Lily Garment bag. DIY Lily Luggage
  10. Lily overnight bag.
  11. Lily pouch.
  12. Electronics case. Bag, case, pouch, ziplock upgrade, whatever you want to call them
  13. TENS machine pouch
  14. Gift earrings. Cheerup jewelry
  15. a billfold
  16. 2 matching bags for razor and foot sander
  17. Another zip pouch out of a pretty scrap that fell off the shelf
  18. 3 drawstring bags for various things to pack
  19. Another garment bag.
  20. Yet another garment bag.
  21. 3 bags to hold games: dominoes (with a Mexican food theme fabric because we play Mexican Train), cards (card/loteria fabric), and Triominoes (rainbow zebras).
  22. 2 drawstring bags for vitamins,
  23. A bag just because the fabric was sitting there,
  24. a large tote to replace the ratty nylon bag for bathroom supplies
  25. A beachcomber tote
    Completed projects: 90

June

  1. letter L hoop
  2. Tote bag, all hand stitched.
  3. Replaced windbreaker zipper.
  4. New buttons on coat
  5. Silver button display
  6. Flower buttons
  7. Crystal skull
  8. June stitchalong, cat
  9. Button dress
  10. Fleece socks
    ----100 projects!—

July

  1. July stitchalong, https://forum.lettucecraft.com/t/i-stitched-some-scraps-and-i-liked-it/
  2. altered beachcomber and another tote.
  3. New mat for button dress
  4. Im sure theres more…

YTD at least 103

August

  1. Scrappy mat for merskelly
  2. Tote bags. At least 3
  3. Loads of small elements for two big projects.

Completed:

Planned projects: art nouveau bedroom, witch couch, HP book nook. By our mini show in October.
Stitch along projects every month

5 Likes