January (finished projects: 11) all from stash
2 grocery totes
2 cloth gift bags,
casserole carrier;
2 pillowcases;
cloth catch bin for table.
Pink ruffly blouse (semi-drafted, no shawl collar). It might as well be spring
Stitchalong hoop
February (finished projects: 8)
- blue ruffly blouse It might as well be spring .
- Drafted shawl collar pattern following How To Draft A Classic Shawl Collar | 2020 Updated Version - YouTube
- Made a CYA from an old shirt. CYA blouse extension
- Made a blouse from a skirt. Boho tunic
- Embellished a blouse I made last year. Embellished tunic
- Designed and 3D printed a hub for dominos that includes storage for trains. Shared it on Thingiverse Mexican train hub with storage by steiconi - Thingiverse
- Emptied my fabric cabinet, wrestled it from the studio to dining room, and filled it with games.
- Assembled and filled new 20-cubby storage unit. It does so count, though the new unit isn’t from scratch.
March (finished projects: 16)
- bed pad carrier for sweet sleep on our travels.
- went through (almost) ALL of my craft supplies, made some hard decisions.
- Pillow carrier
- Pregnant curtains
- Strung up a whole lotta beads. Bead window hanging
- undies
- Made earrings from some Peachbloom glass.
- pads
- Olive green tunic https://forum.lettucecraft.com/t/refashioned-top-top-dress-top-top-top-top
which includes all the other tops and dresses made this month. - Beige and blue dress
- Another green tunic
- Hide-a box for passports and such
- Beige tunic
- Sewing weights filled with high-carb white rice
- Table organizer
- March stitchalong
YTD 35
April New goal: 30 projects in 30 days. Did it!
- prepped supplies for class I’m teaching tomorrow
- Designed and 3D printed a base for my new salt and pepper grinders
- Paint dyed black and white skirt to black and shades of blue
- Taught class
- Finished yet another tunic
- Dyed a few other black and white fabrics to coordinate with skirt, to use for bodice.
- Made a summer nightshirt from stash gauze
- Made another one
- And another!
- Small crossbody purse for travel. Too small, doubled it. Still too small. Sigh.
- Stealth purse to wear under my blouse to hold passport.
- Two more stealth purses; #11 was too small, and hubby wanted one.
- Simple billfold
- Sorted huge gift of beads and findings into my stash.
- Crafted a 4-piece thank you gift. https://forum.lettucecraft.com/t/bead-thingies
50 projects in 100 days! - Visor, drafted pattern and made beige version. Pix of all the visors at Visors 2022
- Hawaiian fabric visor
- blue and white visor, narrow band
- hubby’s visor, narrow band
- Mending and alterations
- April Stitch Along Let’s Stitch Along to the End of Time! - #1414 by steiconi
- Took apart April #10 and turned it into a travelling jewelry keeper.
- camera case with cable pocket
- Repadded dressform
- Draped shoulder princess bodice
- Tea dyed fabric for piping
- Paint dyed more fabric for piping on another project. Made piping!
- Tested and adjusted bodice.
- Redyed piping fabric. Made 6+ yards of piping.
- Drafted petal sleeve pattern.
YTD 65
May
- Made a dress using draped pattern, piping, and petal sleeve New techniques! New dress!
- Made a new ditty bag Ditty bag using the good stuff
- enlarged camera case.
- made another nightshirt
- designed and 3D printed bramble frame for Sleeping Beauty booknook.
- Two more nightshirts
- May stitch along On the Road Again
- Bead thingies. Bead thingies
- Lily Garment bag. DIY Lily Luggage
- Lily overnight bag.
- Lily pouch.
- Electronics case. Bag, case, pouch, ziplock upgrade, whatever you want to call them
- TENS machine pouch
- Gift earrings. Cheerup jewelry
- a billfold
- 2 matching bags for razor and foot sander
- Another zip pouch out of a pretty scrap that fell off the shelf
- 3 drawstring bags for various things to pack
- Another garment bag.
- Yet another garment bag.
- 3 bags to hold games: dominoes (with a Mexican food theme fabric because we play Mexican Train), cards (card/loteria fabric), and Triominoes (rainbow zebras).
- 2 drawstring bags for vitamins,
- A bag just because the fabric was sitting there,
- a large tote to replace the ratty nylon bag for bathroom supplies
- A beachcomber tote
Completed projects: 90
June
- letter L hoop
- Tote bag, all hand stitched.
- Replaced windbreaker zipper.
- New buttons on coat
- Silver button display
- Flower buttons
- Crystal skull
- June stitchalong, cat
- Button dress
- Fleece socks
----100 projects!—
July
- July stitchalong, https://forum.lettucecraft.com/t/i-stitched-some-scraps-and-i-liked-it/
- altered beachcomber and another tote.
- New mat for button dress
- Im sure theres more…
YTD at least 103
August
- Scrappy mat for merskelly
- Tote bags. At least 3
- Loads of small elements for two big projects.
Completed:
Planned projects: art nouveau bedroom, witch couch, HP book nook. By our mini show in October.
Stitch along projects every month